If you want to analyze data as if its standards were configured differently—without actually changing those standards—you can expand the Standard overrides tree and temporarily override the settings.
The Standard overrides node is located at the top level on the Settings tab:
For help with using tree structures like the one on the Settings tab, see Navigating Tree Structures
Some of the standard settings will impact the statistics that you report in different ways. These standard settings can be grouped as follows:
Standard override setting: |
Affects this statistic: |
Improvement start date |
|
Improvement start value |
|
Memo |
|
Note: This standard override is not applied to Data Tables. |
|
Process |
Note: This standard override is not applied to Data Tables. |
Standard Sample size |
|
Goal Yield |
|
Acceptable Yield |
Standard override setting: |
Affects these statistics: |
Also affects the calculation of other statistics, such as: |
Cost per Unit |
||
Lower Gate |
||
Opportunities per Unit |
||
Upper Gate |
For more information on individual settings in standards or processes, see DMS Processes and DMS Standards.