window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'G-X31CSP7LDB'); gtag('config', 'AW-1071191387');

GainSeeker® OPC solution boosts OEE from 65% to 75% (Short version)

A manufacturer of work-enabling devices for the transportation industry collected and analyzed downtime information in new ways using GainSeeker. The company now keeps with up with increased product demand without increasing production capacity (no capital investment) or staffing.

By |2024-02-19T09:27:47-05:00April 2, 2013|Case Studies, Defense, Industrial Equipment, Industry|Comments Off on GainSeeker® OPC solution boosts OEE from 65% to 75% (Short version)

GainSeeker® OPC solution boosts OEE from 65% to 75% (Full version)

“In a data driven society, automated data collection is a must,” says John Foley, Network Administrator for Engineering Systems, of Pollak-APD (Actuator Products Division) a Stoneridge, Inc company. “The quicker we get information in hand, the better-off we are.” With this idea in mind, Hertzler Systems recently added some major new functionality to GainSeeker® SPC: support for OPC (Object Linking and Embedding for Process Control).

By |2023-09-27T09:57:11-04:00April 2, 2013|Case Studies, Defense, Industrial Equipment, Industry|Comments Off on GainSeeker® OPC solution boosts OEE from 65% to 75% (Full version)

Down-time Analysis Reduces Waste

Over a six-month period, GainSeeker helped a department of a transmission components supplier reduce the number of work days by two that it needed to keep up with production demands each week. Meanwhile, output increased by 25% as defects and scrap were minimized.

By |2023-09-27T09:56:14-04:00April 2, 2013|Case Studies, Automotive, Industry|Comments Off on Down-time Analysis Reduces Waste

Controlling Net Contents and Reducing Give-Away

Consolidated Biscuit Company (CBC) has used Control Charts for years, but the culture of process control is now permeating the company like the smell of cookies baking. The cost savings attributed to not giving away unnecessary amounts of product is substantial.

By |2024-02-20T08:48:24-05:00April 2, 2013|Case Studies, Foods, Industry|Comments Off on Controlling Net Contents and Reducing Give-Away

McCormick Flavor Division reduces overpack and material costs by 10-30%

"Of all the plants in the McCormick Flavor Division, our plant is consistently at the top of the list for efficiency of material usage, and by a substantial margin. We trace that directly back to our use of the Hertzler [GainSeeker] software," John Campbell, quality manager, McCormick Flavor Division of McCormick & Company, Inc.

By |2024-02-20T09:15:32-05:00April 2, 2013|Case Studies, Foods, Industry|Comments Off on McCormick Flavor Division reduces overpack and material costs by 10-30%

Building a Six Sigma Measurement System in Financial Services

This case study looks at one company’s experience deploying and implementing a set of Six Sigma projects within the context of a robust data systems infrastructure – the establishment of which is a fundamental first step in developing an effective transactional Six Sigma initiative. With such an infrastructure in place, projects can proceed more rapidly and with greater success.

By |2024-02-19T07:21:40-05:00April 2, 2013|Case Studies, Etc., Industry|Comments Off on Building a Six Sigma Measurement System in Financial Services

Real-time automated data empowering Precision Machining Industry

Empowering operators with real-time, automated data and drill-down capabilities led to dramatic improvements in first-past yield and reduced scrap costs for a leading Precision Machining company.

By |2023-09-26T05:01:46-04:00July 14, 2011|Case Studies, Analyze Using Charts, Automated, Automotive, Features, GainSeeker, GainSeeker Dynamic Reports, Industry, Machines, Machining, Mobile, Monitor KPIs using Dashboards, Real-Time Data Entry, Solutions|Comments Off on Real-time automated data empowering Precision Machining Industry
Go to Top