window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'G-X31CSP7LDB'); gtag('config', 'AW-1071191387');

Real-time Data Drives a Hole-in-one (Full version)

In this magazine article, Plastics Business magazine examines Hertzler customer Acushnet (Titleist) Company's application of SPC using GainSeeker Suite. Ken Welchman, Director of Corporate Quality, says “When you are The #1 Ball In Golf, everyone is gunning for you . . . The quality of our products is judged every day by the best golfers in the world.”

By |2023-09-27T09:25:25-04:00April 2, 2013|Case Studies, Industry, Sporting Goods|Comments Off on Real-time Data Drives a Hole-in-one (Full version)

Hormel Foods Weight Control Program – Video Presentation

Marty A. Slagel, Corporate Staff Quality, Hormel Foods, gave a compelling presentation to the Aberdeen Group's "Manufacturing in the 21st Century" conference, December 2008, in Boston, Massachusetts. Hormel Foods has been a GainSeeker user for several years. You can access the video and view his presentation.

By |2023-09-27T09:26:32-04:00April 2, 2013|Case Studies, Foods, Industry|Comments Off on Hormel Foods Weight Control Program – Video Presentation

Acushnet Supplier Improvement Program (Short version)

Long-time GainSeeker user and sporting goods giant Titleist needed a formalized system for rating raw materials and supplier performance for its golf ball manufacturing division, Acushnet. The company now tracks supplier quality for the top 80 percent of their purchasing dollars, in addition to tracking production quality data with great results.

By |2024-02-20T08:52:47-05:00April 2, 2013|Case Studies, Industry, Sporting Goods|Comments Off on Acushnet Supplier Improvement Program (Short version)

Acushnet Supplier Improvement Program – Live Audio Podcast

Ken Welchman, director of quality, Golf Ball Operations, Acushnet Company (Titleist), gave a compelling presentation at the IQPC Six Sigma Summit in Orlando, Florida, in January 2008. It is a fascinating glimpse at what makes Titleist the #1 Ball in Golf. Titleist is a long-time GainSeeker user.

By |2023-09-27T09:29:19-04:00April 2, 2013|Case Studies, Industry, Sporting Goods|Comments Off on Acushnet Supplier Improvement Program – Live Audio Podcast

Walking the talk – Empowering people with data (Full version)

This article describes how the Six Sigma effort at Micropump and Hertzler Systems’ software solutions have come together to yield outstanding results. Micropump 'Walks the Talk' when it comes to providing data to drive decisions. Micropump, a unit of IDEX Corporation, is a leader in product innovation and also a leader in innovation in Operational Excellence.

By |2024-02-19T09:28:32-05:00April 2, 2013|Case Studies, Industrial Equipment, Industry|Comments Off on Walking the talk – Empowering people with data (Full version)

GainSeeker® OPC solution boosts OEE from 65% to 75% (Short version)

A manufacturer of work-enabling devices for the transportation industry collected and analyzed downtime information in new ways using GainSeeker. The company now keeps with up with increased product demand without increasing production capacity (no capital investment) or staffing.

By |2024-02-19T09:27:47-05:00April 2, 2013|Case Studies, Defense, Industrial Equipment, Industry|Comments Off on GainSeeker® OPC solution boosts OEE from 65% to 75% (Short version)

GainSeeker® OPC solution boosts OEE from 65% to 75% (Full version)

“In a data driven society, automated data collection is a must,” says John Foley, Network Administrator for Engineering Systems, of Pollak-APD (Actuator Products Division) a Stoneridge, Inc company. “The quicker we get information in hand, the better-off we are.” With this idea in mind, Hertzler Systems recently added some major new functionality to GainSeeker® SPC: support for OPC (Object Linking and Embedding for Process Control).

By |2023-09-27T09:57:11-04:00April 2, 2013|Case Studies, Defense, Industrial Equipment, Industry|Comments Off on GainSeeker® OPC solution boosts OEE from 65% to 75% (Full version)

Down-time Analysis Reduces Waste

Over a six-month period, GainSeeker helped a department of a transmission components supplier reduce the number of work days by two that it needed to keep up with production demands each week. Meanwhile, output increased by 25% as defects and scrap were minimized.

By |2023-09-27T09:56:14-04:00April 2, 2013|Case Studies, Automotive, Industry|Comments Off on Down-time Analysis Reduces Waste

Controlling Net Contents and Reducing Give-Away

Consolidated Biscuit Company (CBC) has used Control Charts for years, but the culture of process control is now permeating the company like the smell of cookies baking. The cost savings attributed to not giving away unnecessary amounts of product is substantial.

By |2024-02-20T08:48:24-05:00April 2, 2013|Case Studies, Foods, Industry|Comments Off on Controlling Net Contents and Reducing Give-Away

McCormick Flavor Division reduces overpack and material costs by 10-30%

"Of all the plants in the McCormick Flavor Division, our plant is consistently at the top of the list for efficiency of material usage, and by a substantial margin. We trace that directly back to our use of the Hertzler [GainSeeker] software," John Campbell, quality manager, McCormick Flavor Division of McCormick & Company, Inc.

By |2024-02-20T09:15:32-05:00April 2, 2013|Case Studies, Foods, Industry|Comments Off on McCormick Flavor Division reduces overpack and material costs by 10-30%
Go to Top